Diagram of Banda Production Manifold Side and End Covers Removed for Clarity Lower anchor clamps on support vessel prior to installation on Siri Laggan Tormore Development

The Banda Field is located approximately 80 Km. from the Mauritanian coast at a water depth of 230m, the subsea production facilities will comprise four production wells and a production manifold which will be linked to the shore side facilities via a 12” gas export pipeline. Read more...

Located in block 5604 / 20 in the north-western part of the Danish sector of the North Sea. The Siri platform is a MOPUSTOR self-installing design which started production in 1999, and has an expected lifetime to 2020.  Read more...

The Laggan and Tormore fields are located approximately 125km north-west of the Shetland Islands, and represent the future of the UK oil and gas industry. Read more...

Diagram York Hot Tap Tee and Cofferdam Arrangement Diagram Ormen Lange Hot Tap Arrangement Diagram of Pressure Flask Lifting Study

York is one of the largest undeveloped gas fields in the Southern North Sea. The Client’s requirements were for Pre-FEED and FEED studies to confirm the viability of performing a mechanical hot tap into the BP SNSPS pipeline as the basis for connection of the York export pipeline. Read more...

The Ormen Lange Field is located in 850m of water in the Norwegian sector of the North Sea. The Client required project and operational support for two subsea hot taps into the Ormen Lange export pipelines. Read more...

The Hoton field is located in the Southern sector of the North Sea. The Client required a concept screening study to determine optimal sizing and routing of a gas export pipeline and detailed design of a riser system to support gas production from a second Hoton well. Read more...

Model of Broom Pipeline Insulation Clam Shells Divers working subsea

The Broom field is located in the East Shetland basin approximately 7km SW of the Heather platform in 140m of water. Following failure of the P1 pipeline, the Client required operational support to determine failure mode and preliminary costing for a replacement pipeline. Read more...

The Dunbar coaxial pipeline conveys multiphase production fluids from the Dunbar platform to the Alwyn platform. The Client’s requirement was for project engineering and personnel to support installation of a replacement pipeline within a 15 month deadline. Read more...

Clear Well Subsea logo

Case Studies

Diagram of Banda Production Manifold Side and End Covers Removed for Clarity
Lower anchor clamps on support vessel prior to installation on Siri
Laggan Tormore Development
Diagram York Hot Tap Tee and Cofferdam Arrangement
Diagram Ormen Lange Hot Tap Arrangement
Diagram of Pressure Flask Lifting Study
Model of Broom Pipeline Insulation Clam Shells
Divers working subsea